Air Separation

  • PPU For HP N2
  • 6,200 SCFM, 156 PSI
  • H2 & CaO Removal
  • Catalyst Bed
  • Economizer
  • Trim Heater
  • Aftercooler
  • R134a Chiller
  • Packaged chiller and TSA
  • Air chilled to 40°F
  • H2O & CO2 removed in dual bed of Activated Alumina and Molecular Sieve
  • 660,000 SCFH
  • H2O & CO2 Removal
  • Touch Screen/PLC
  • Factory Insulation
  • Afterfilter
  • 22,000 SCFH
  • H2O & CO2 Removal
  • Touch Screen/PLC
  • Factory Insulation
  • Afterfilter

Air - Catalyst Skid

  • H2O & CO2 Removal
  • Catalyst
  • Economizer
  • Trim Heater
  • Aftercooler
  • Separator

Argon

  • 1.0 ppmv exit H2O
  • Automatic Operation
  •  Internally heated design
  • N2 Regeneration Type
  • "P" design

ARGON DEOXO/DRYER

  • 2 Stage Oil Removal Filters
  • Carbon Bed
  • Carbon Filter
  • Deoxo Unit
  • Finned Pipe
  • Aftercooler
  • Separator
  • Type "P" Dryer
  • Afterfilter

Helium/Nitrogen

  • 5.8 MMSCFD
  • Exit H2O < 1.0 ppmv
  • Exit CO2 < 1.0 ppmv
  • 400 MWP
  • Double block & bleed
  • Factory insulation

Hydrogen

  • PSA Skid
  • 66 Ft. Long
  • 5 Vessels
  • Galvanized Base

Methane

  • 40 MMSCFD
  • 700 MWP
  • 1.0 PPMV Exit H2O
  • Two Tower
  • Fired Heater
  • Orbit Valves

Structural Fabrication

All Manufacturing Processes Completed In-House
Engineered to Customer Specifications
350,000 Square Foot Facility
Auto Cad / Rebis 3-D Design
AWS D1. 1 Certified

Vessels and Tanks

PSB holds the U, UM, S, and R Code Stamps of Authorization
Pressure Vessels are designed and fabricated per ASME Section VIII Div. 1 Requirements
Certified / Qualified Welders-ASME, Section IX

Specialized Painting

Pressurized / Airless Paint Systems
Urethane / Enamel Finishes
Two part Epoxies
Inorganic Zinc Primer

Sand Blasting

Six Multimedia Blasting Booths
Glass Bead
Sand Blast

Control Panel Assembly and Testing

UL, CSA
NEC Electrical
Design & Engineering to Customer specifications